These are academic VTR/PTM 45 nm post-route estimates on a homogeneous LUT6 target.
They are not ASIC signoff, commercial-FPGA characterization, physical-board
measurements, measured energy, or manufactured-silicon evidence. Percentages apply
only to each case's frozen contract and are not a cross-circuit performance ranking.
The ML-KEM CBD case is not side-channel analysis or certification of a complete
cryptographic implementation.
Bring your real constraints
Run the pilot in your implementation flow.
The public portfolio qualifies the method under a pinned academic proxy. A customer
pilot replaces that proxy with customer-owned RTL, assumptions, libraries,
constraints, activity, tools, and acceptance policy.
Design team provides
Authorized RTL and dependencies
Interface and correctness contract
Target technology or device
EDA flow, versions, and constraints
Activity model when power is in scope
Primary metric and validity limits
Göther returns
Reproduced baseline record
Accepted RTL candidate, if one qualifies
Exact before/after patch
Functional and formal results
Paired implementation evidence
Limitations and adoption recommendation
A result means only what the agreed evaluation contract supports.
Start the evaluation
Choose the block. Set the target.
The first conversation should establish the function, target, current flow,
correctness stack, primary objective, confidentiality boundary, and evaluation window.